We had our official ‘walkthrough’ today which included an overview of the construction process, and a Q and A period.
It was nice to meet with Tony and (the builders) to ge

t a feel for the process and the what the next steps are.
As far as the site is concerned, a few things have been completed including the water and sewer lines being plumbed in (you can see the water line in the picture below, its the curly black thing coming out of the ground on the right side) and some drainage being put in. The garage floor has also been poured, and the front slab of the porch has been finished which includes the 'pebbling' texture that looks much different from the smooth texture of the garage floor. Apparently the process for achieving the pebbled finish is not much different that the w

ay they poor smooth concrete. The only difference is that they add an extra step after they have trowled the concrete where they poor a sugary solution to the top of the concrete, which erodes away the top layer of the cement and exposes the rocks beneath.
The other nice change was the addition of my last name to the homesite sign. Brian's name should be added soon as well.
We're excited about the rest of the process and are pleased with the progress that has been made so far. The only remaining decisions that we have are for the fencing layout and the size of the back porch of the house, which we will have to make in 5 weeks once the frami
ng is done and the drywall is ready to go in.
We will continue to update the blog through the framing process. However, there may be less frequent updates as there may not be as much to share.