Tuesday, July 24, 2007
Wednesday, July 18, 2007
Drywall
Dave and Brian
Wednesday, July 11, 2007
Paint and Sirens
Its been a while since we've updated the blog as we've been dealing with a lot of issues with the builder that have since been resolved. However, we are happy to report that there has been some progress made in the last few weeks.


The biggest change is the exterior paint. It's exciting to see the exterior of the house completed(with the exception of the rockwork). As we mentioned before, the color is a dusty greenish / gray color with a darker olive green contrast color. The shutters havent gone on yet, but should be installed later in the process.
Other than that there is not too much to photograph other than the large siren that is in our attic. Presumably, this is for the security system. :) All of the electrical and structured wiring has been installed, and we're hoping to see the garage door and drywall go in before the end of this week.
Dave and Brian
The biggest change is the exterior paint. It's exciting to see the exterior of the house completed(with the exception of the rockwork). As we mentioned before, the color is a dusty greenish / gray color with a darker olive green contrast color. The shutters havent gone on yet, but should be installed later in the process.
Other than that there is not too much to photograph other than the large siren that is in our attic. Presumably, this is for the security system. :) All of the electrical and structured wiring has been installed, and we're hoping to see the garage door and drywall go in before the end of this week.
Dave and Brian